Temporary Traffic Lights

WTM Traffic Management can supply and install 2-way, 3 and 4-way (Multi-Phase) signals to suit any requirement together with a service in on-site daily maintenance.

We are also able to supply with these systems, dedicated signal controlled pedestrian crossings that enable the safe management of pedestrians around work sites.

Signals can be supplied and powered by battery, mains or diesel. 

Quality assured to ISO9001 standard, all of our equipment is put through a rigorous "Ready For Hire" documented testing process before delivery.

Using the correct type of equipment WILL help ensure the safety of the public and your work force.

Temporary Traffic Lights feature image